Skip to main content
What's Included

Built for Medical-Grade Moves.

Every healthcare relocation covers equipment specialists, compliance documentation, and phased planning — not just trucks and labour.

  • Medical Equipment Handling

    OEM-trained dismantling and reinstallation for MRI, CT, X-ray, ultrasound, and lab analysers.

  • Cold-Chain Logistics

    Temperature-controlled transport for vaccines, blood samples, reagents, and pharma inventory.

  • Patient Data Security

    Chain-of-custody protocols for servers, HIS/EMR hardware, and physical patient records.

  • Phased Zero-Downtime Move

    Staged relocation that keeps OPD, diagnostics, or wards operational during the shift.

  • Biohazard & Waste Compliance

    Biomedical waste segregation and disposal as per BMW Rules, 2016 before transit.

  • Calibration & Handover

    Post-move calibration certificates and NABH/JCI-ready documentation for every asset.

How It Works

From Survey to Handover — 4 Phases.

A structured relocation plan designed around clinical operations, not around trucks.

  1. Site Survey & Asset Audit

    On-site review of equipment, utilities, and inventory to build a move blueprint.

  2. Compliance Planning

    Data security, cold-chain, and biomedical waste protocols documented and approved.

  3. Phased Packing & Transit

    Equipment dismantled, crated, and moved in phases to keep the facility operational.

  4. Reinstall & Calibration

    Equipment reinstalled, tested, calibrated, and handed over with compliance certificates.

Price Estimates

Healthcare Relocation Cost (2026 Estimates).

Indicative pricing by facility size and packing grade. Final quote depends on equipment inventory, distance, and phasing.

Healthcare facility relocation cost estimates in India for standard and premium packing by facility size
Facility Type Standard Packing Premium / OEM-Assisted
Clinic / OPD (up to 2,000 sq ft) ₹50,000 – ₹1,50,000 ₹1,50,000 – ₹3,00,000
Diagnostic Centre / Polyclinic ₹1,50,000 – ₹4,00,000 ₹4,00,000 – ₹7,50,000
Nursing Home / Small Hospital ₹4,00,000 – ₹10,00,000 ₹10,00,000 – ₹18,00,000
Multi-Specialty Hospital ₹10,00,000 – ₹35,00,000 ₹35,00,000+ (custom)

* Premium = OEM-assisted dismantling, cold-chain logistics, biomedical waste coordination, and calibration certificates. Imaging equipment (MRI, CT) quoted separately.

Why Choose Puniyo

Healthcare Moves Need Specialists, Not Brokers.

Verified vendors with medical-grade capability, transparent pricing, and no commission.

  • OEM-Trained Technicians

    Dismantling and reinstallation handled by OEM-certified or biomedical engineers.

  • Full Transit Insurance

    Asset-value-based coverage for high-value medical equipment and diagnostic devices.

  • Zero Brokerage

    Direct vendor contact. No middlemen, no commission, no hidden markups.

  • Regulatory Compliance

    Protocols aligned with NABH, BMW Rules 2016, and state health department norms.

  • OTP-Secured Enquiry

    Your contact and facility details protected with OTP. No spam calls, ever.

  • Dedicated Move Manager

    Single point-of-contact for the entire relocation, from survey to handover.

FAQ

Healthcare Relocation — Questions Answered.

How long does a healthcare facility relocation take?
A small clinic typically relocates in 3–7 days. Diagnostic centres and polyclinics take 1–2 weeks. Small hospitals take 2–4 weeks, and multi-specialty hospitals are phased across 4–10 weeks to keep critical services running.
Can you relocate MRI, CT, and other imaging equipment?
Yes, but imaging equipment requires OEM-certified dismantling due to magnet quench and calibration risks. We coordinate with the OEM or its authorised partner for de-installation, transport, and re-installation.
How is patient data protected during the move?
Servers, HIS/EMR hardware, and physical patient records move under a documented chain-of-custody protocol. Devices are sealed, logged, and transported in locked carriers. Physical records are crated separately with restricted access.
Do you handle cold-chain items like vaccines and blood samples?
Yes. Temperature-controlled carriers with data loggers maintain 2–8°C for vaccines, reagents, and biological samples. Cold-chain documentation is provided at handover for regulatory audit.
What about biomedical waste during relocation?
Biomedical waste must be disposed of per BMW Rules, 2016 before the move. We coordinate with your authorised waste handler for final clearance and provide documentation before equipment is dismantled.
Will my facility need to shut down during the move?
Not necessarily. For most facilities we plan phased moves so OPD, diagnostics, or wards remain operational. Critical services can continue while non-critical departments shift first.
Do you provide calibration certificates after reinstallation?
Yes. Post-move calibration, safety testing, and electrical checks are performed by qualified biomedical engineers, with certificates provided for NABH, JCI, or state health audits.

Planning a facility relocation?

Get free quotes from verified healthcare relocation specialists in under 2 minutes. OTP-secured. No spam. No brokerage.

Get Free Quote Now